Permits Index
6
Permits, 24 months
30 on record
21
Roofing permits
Aug 4, 2026
Last permit issued
20
Addresses with a page

Roofing: 21 permits

From Aug 4, 2017 to Jun 15, 2026. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 2 listed below. Earlier permits, 19, are on their house pages: 2024: 2 · 2023: 3 · 2021: 3 · 2020: 4 · 2019: 2 · 2018: 2 · 2017: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 15, 2026ReRoof: reroofing. tile reset, replace underlayment & reinstall tile1 family dwelling$20,000—202606153236
May 13, 2026ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$14,500—202605131195

Plumbing: 4 permits

From Mar 2, 2018 to May 12, 2023. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 0 listed below. Earlier permits, 4, are on their house pages: 2023: 1 · 2021: 1 · 2019: 1 · 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 2 permits

From Jul 9, 2025 to Aug 4, 2026. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 4, 2026otc alterations permit: revision to permit 202511069123 to replace natural gas forced air furnace with mini-splits. remove the 2nd door to the rear yard. change the primary closet door from pocket to in-swing1 family dwelling$1—202606113061
Jul 9, 2025otc alterations permit: add wall and entry door with sidelights at front ground fl vestibule behind security gate. add wall at reat of ground floor to improve flow btwn hall, bedroom, office & back stair spaces. add/move lights swithces and outlets to fit new configuration. extend furnace vents in office and bedroom1 family dwelling$8,000—202507090480

Electrical: 2 permits

From Mar 6, 2020 to Dec 19, 2024. Fewer than 5 electrical permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Dec 19, 2024otc alterations permit: bathroom remodel in kind. create dedicated electrical circuit1 family dwelling$25,000—202412197149

Solar: 1 permit

From Mar 6, 2026 to Mar 6, 2026. Fewer than 5 solar permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 6, 2026additions alterations or repairs: 3rd floor addtion to an existing 2-story sfr subject to sec311 planning/ design review process. rooftop pv solar system. new elevator to servce all floors. interior remodel of existing floors. pv system at roof1 family dwelling$631,392—202508203521

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.