From Jan 13, 2020 to Sep 2, 2026. Across 38 roofing permits since October 5, 2024, most declared values run from $5,000 to $123,000 (the middle 80%); the median is $13,600 and half fall between $7,000 and $48,946. The lowest on record is $3,000 and the highest $5,000,000.

Since October 5, 2024, 39 listed below. Earlier permits, 47, are on their house pages: 2024: 12 · 2023: 15 · 2022: 6 · 2021: 7 · 2020: 7.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 2, 2026Bldg-Alter/Repair: eplan New tenant improvement to existing grocery market to include: Demolition of floor fixtures and refrigerated cases, finish flooring, checkstands, front of store lighting, and roof mechanical equipment. New and/or relocated floor fixtures and refrigerated cases, checkstands, front of store lighting, refurbish customer restrooms to be compliant, non-bearing wall at new customer service, compliant exterior sidewalk, compressor room at mezzanine and roof mechanical equipment. New plumbing and electrical. New structural calculations for new roof mechanical equipmentGrocery Store$200,000—26016-20000-12167
Aug 26, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 230 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$120,000—26016-10000-22817
Aug 5, 2026Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO 26016-90000-12491 TO UPDATE WORK DESCRIPTION TO READ:Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_32_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Retail Store or Business——26016-10001-12491
Aug 4, 2026Bldg-Alter/Repair: Supplemental to 22010-10000-3602**Revision to enclose the Building A roof access stairs for water protectionApartment$5,000—22010-10004-03602
Jun 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__12___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BCondo-Multi Family$5,000—26016-30000-14844
Jun 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_14_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Condo-Multi Family$7,000—26016-10000-16550
Jun 22, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing _20_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BCondo-Single Family$5,000—26016-40000-15405
Jun 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing _15_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BCondo-Single Family$9,800—26016-40000-15429
Jun 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __41____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$14,200—26016-40000-14837
Jun 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _13_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$7,000—26016-10000-15445
Jun 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___16___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BCondo-Multi Family$7,000—26016-10000-14833
Jun 4, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __17__Squares . Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Condo-Multi Family$6,700—26016-10000-14780
Jun 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 60 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$12,000—26016-90000-14675
Jun 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing ___30__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BApartment$9,100—26016-20000-14714
Jun 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing ___14___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BApartment$5,800—26016-20000-14671
Jun 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B."COMPLY WITH DEPARTMENT ORDER effective date10/27/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Condo-Multi Family$10,000—26016-20000-14536
Jun 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_14_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BCondo-Single Family$10,000—26016-10000-14565
Jun 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 216 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BRetail Store or Business$43,200—26016-90000-14415
May 29, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$5,500—26016-20000-14253
May 11, 2026Bldg-Alter/Repair: Application of an approved coating to an existing roofRetail Store or Business$45,782—26016-90000-12491
May 8, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. "COMPLY WITH DEPARTMENT ORDER effective date 10/27/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Hotel$15,000—26016-20000-12235
May 6, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing ___290___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BApartment$101,500—26016-20000-12024
Apr 17, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B."COMPLY WITH DEPARTMENT ORDER effective date10/27/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Motel$15,000—26016-20000-10199
Apr 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overnew solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$60,000—26016-20000-08586
Mar 24, 2026Sign: eplan. Reface of Roof Sign D 15'-9"x 6' (94.5 sf, @ 35'-9" from grade, read as "VONS")Roof Sign$3,000—26048-10000-00381
Mar 24, 2026Sign: eplan. Refacing Roof Sign B 15'-9"x 6' (94.5 sf, @ 35'-9")Roof Sign$3,000—26048-10000-00380
Feb 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. "COMPLY WITH DEPARTMENT ORDER effective date02/03/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Restaurant$13,000—26016-20000-04829
Jan 13, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BRetail$25,000—26016-20000-01094
Dec 17, 2025Bldg-Alter/Repair: ePlan Supplemental Permit to 24014-10000-03137. Change E.O.R. and A.O.R. Reroof bedroom, demo chimney and replace with electric fireplace, and structural changesDwelling - Single Family$99,000—24014-10004-03137
Nov 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 227 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$45,400—25016-90000-34979
Sep 10, 2025Bldg-Alter/Repair: REMODEL TO 2 STORY OFFICE BUILDING WITH 2 LEVELS OF UNDERGROUND PARKING INCLUDES REFINISHING AND INSULATING OR CEMENT PLASTER CLADDING, REPLACEMENT OF PUNCHED AND STOREFRONT GLAZING, REPLACEMENT OF SELECTED EXTERIOR DOORS, ROOFING REPLACEMENT, REPLACEMENT OF RAISED TERRACE DECK PAVING AND WATERPROOF SYSTEMS, REPLACEMENT OF EXTERIOR LIGHT FIXTURES, REPLACEMENT OF EXISTING SYLIGHTS AT UPPER ROOF LEVEL AND LEVEL 2Office$5,000,000—25016-20000-17459
Sep 9, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire HazardSeverity Zone . For residential roof replacement > 50% of the total roof area, applyCool Roof Product labeled and certified by Cool Roof Rating Council . CoOffice$103,000—25016-20000-27185
Jul 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __315__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$190,000—25016-10000-21380
Jul 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 42 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,400—25016-90000-21115
Jul 2, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 48 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$9,600—25016-90000-20814
May 16, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _200_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$130,000—25016-10000-16236
Jan 21, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$50,000—25016-20000-01570
Nov 22, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 103 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$20,600—24016-90000-37363
Nov 5, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 100 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$20,000—24016-90000-35480

Heating and cooling: 32 permits

From Jan 9, 2020 to Jul 10, 2026. Across 12 heating and cooling permits since October 5, 2024, most declared values run from $1,255 to $163,655 (the middle 80%); the median is $2,900 and half fall between $1,863 and $11,093. The lowest on record is $800 and the highest $186,000.

Since October 5, 2024, 12 listed below. Earlier permits, 20, are on their house pages: 2024: 4 · 2023: 4 · 2022: 5 · 2021: 4 · 2020: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 10, 2026Bldg-Alter/Repair: Window-4 change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$2,800—26016-40000-18222
May 18, 2026Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings . Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$3,000—26016-30000-13087
Jan 5, 2026Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,900—25016-20000-37575
Jan 5, 2026Bldg-Alter/Repair: Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,750—25016-20000-37573
Sep 25, 2025Bldg-Alter/Repair: Door change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council , is required for doors and windowsreplaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,200—25016-20000-28783
Jun 30, 2025Bldg-Alter/Repair: Supplemental to permit 24016-40000-14264 to add 2--WINDOWS and 2--DOORS change-out (same size & type) for residential buildings. Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Dwelling - Single Family$9,274—24016-40001-14264
Jun 18, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeledand certified by National Fenestration Rating Council , is required for doors and windowsreplaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BApartment$3,000—25016-20000-19440
Apr 23, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeledand certified by National Fenestration Rating Council , is required for doors and windowsreplaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BApartment$16,550—25016-20000-12998
Feb 13, 2025Bldg-Alter/Repair: ePlan. Tenant improvement to reconfigure medical office building including triage rooms to create a more open waiting room, reception desk and weight alcove that follows the current processing flow for the outpatient Immediate Care Clinic. The scope includes removal of Staff shower to enlarge storage room and reuse mechanical ducts with minor supply and return grill relocationsMedical Office$180,000—24016-20000-25771
Nov 20, 2024Bldg-Alter/Repair: Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BApartment$186,000—24016-20000-37047
Oct 29, 2024Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,900—24016-10000-34534
Oct 16, 2024Bldg-Alter/Repair: 1 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24Apartment$800—24016-10000-33004

Plumbing: 18 permits

From Jan 22, 2021 to Nov 17, 2025. Fewer than 5 plumbing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 1 listed below. Earlier permits, 17, are on their house pages: 2024: 5 · 2023: 1 · 2022: 6 · 2021: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 17, 2025Bldg-Demolition: DEMO THE DETACHED REC ROOM. SEWER CAP REQUIREDDemolition$6,000—25019-20000-03370

Solar: 12 permits

From Feb 11, 2020 to Jun 26, 2025. Fewer than 5 solar permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 4 listed below. Earlier permits, 8, are on their house pages: 2024: 2 · 2023: 1 · 2022: 1 · 2021: 2 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 26, 2025Bldg-Alter/Repair: EPLAN: INSTALL NEW ROOFTOP MOUNTED PHOTOVOLTAIC SYSTEM MOTEL BUILDING PER ENGINEERINGMotel$150,000—24016-20000-35649
Jun 5, 2025Bldg-Alter/Repair: EPLAN: INSTALL NEW ROOFTOP BALLASTED PHOTOVOLTAIC SYSTEM 2 STORY MOTEL BUILDING PER ENGINEERINGMotel$150,000—24016-20000-33283
Apr 3, 2025Bldg-Alter/Repair: New solar panel array attachment only at rooftop of Building #A, B, C, and D per engineer detailsApartment$450,757—24016-10000-30526
Mar 20, 2025Nonbldg-Alter/Repair: Add new antennas to the existing tower. Add 1 new battery rack and new batteries within existing enclosure. upgrade breakers and add a new baseband unitTelecommunication Transmitter - wireless$30,000—24020-10000-02263

Electrical: 5 permits

From Feb 23, 2022 to Jul 9, 2026. Fewer than 5 electrical permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 2 listed below. Earlier permits, 3, are on their house pages: 2024: 2 · 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 9, 2026Grading: Grading for new pad/vault and trenching for new electrical conduits. ***ELECTRICAL/MECHANICAL EQUIPMENT UNDER SEPARATE PERMIT***Grading - Hillside$51—26030-30000-04207
Mar 16, 2026Bldg-Alter/Repair: Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two family dwelling)Dwelling - Single Family$3,000—26016-90000-07006